USD87.45EUR96.21RUB1.06
24.kg

Engineering surveys underway in Tokmok for railway construction

12:31, 17 November 2026, Bishkek - 24.kg news agency

Specialists from the Department of Engineering Surveys under the Ministry of Construction, Architecture, Housing and Communal Services of Kyrgyzstan have conducted engineering and geological surveys at a site designated for railway construction in Tokmok.

As part of the work, 27 boreholes, ranging from 6 to 12 meters deep, were drilled. Soil samples were also collected for laboratory testing.

The data obtained will help determine soil characteristics and take them into account when developing design solutions and proceeding with railway construction.

The survey results are needed to assess construction conditions and select technical solutions that will ensure the reliability of the railway infrastructure.

CONTACTS

SOCIAL MEDIA

TelegramYouTubeWhatsAppFacebookInstagram

© News Agency «24.kg» - News of Kyrgyzstan. All rights reserved. All information posted on this website is intended for personal use only and may not be distributed without the written permission of NA «24.kg». The editorial team is not responsible for the content of reprinted materials and statements of individuals. +18