USD87.45EUR95.88RUB1.07
24.kg

Ten new schools in Osh planned to be commissioned in September-October

16:47, 18 August 2026, Bishkek - 24.kg news agency
Myrzaiym ZHANYBEK KYZY

Construction of ten new schools in Osh is scheduled to be completed in September-October. Minister of Construction, Architecture, Housing and Communal Services of Kyrgyzstan Nurdan Oruntaev announced during a tour of the city’s social facilities. Osh Mayor Zhanarbek Akayev also toured the sites together with the minister.

According to Nurdan Oruntaev, construction of most of the schools began in March of this year. Approximately 7 billion soms have been allocated from the budget for the construction of the ten educational facilities. All schools are designed for large capacity, with the exception of one small facility.

The minister noted that the construction schedule for some schools has been delayed due to soil conditions in Osh. Due to the soft soil, excavation work and foundation construction require more time.

«If we don’t make it in September, then all the facilities should be completed in October,» Oruntaev said.

After construction is completed, the schools will undergo a three-stage inspection. According to the minister, the buildings are designed for seismic resistance up to magnitude 9. However, the actual safety factor will be approximately 20 percent higher than the established requirement.

Schools visited by the minister and the mayor

Salizhan Zhigitov school for 1,200 students

The four-story building, with a total area of ​​13,610 square meters, is being built on the instructions of the president, financed from the republican budget. The walls have been erected, the roof has been completed, and interior finishing work is ongoing. President Sadyr Japarov launched construction in April of this year by laying a time capsule.

School on Mamytov Street for 275 students

Construction of the facility began in July 2025. The project is being implemented by Kyrgyzkurulush State Enterprise using funds from the Stabilization Fund. The school will include a laboratory, library, canteen, assembly hall, and a sports hall. Construction is nearly complete, and the facility is scheduled to open by the start of the new academic year.

School in Ak-Buura-2 residential complex for 800 students

The four-block building, with a total area of ​​8,339 square meters, is being built using funds from the republican budget. The three-story building has already been erected and the roof installed, and facade insulation is currently being carried out. Once opened, the school will be able to accommodate approximately 2,000 students in two shifts.

The M.V. Lomonosov school for 1,000 students

A new four-story building with an area of ​​10,896 square meters is being erected on the site of a dilapidated school, which celebrated its 100th anniversary this year. The main building frame has already been constructed, windows have been installed on three floors, and interior finishing work is underway. The new school will provide modern learning conditions for students.

CONTACTS

SOCIAL MEDIA

TelegramYouTubeWhatsAppFacebookInstagram

© News Agency «24.kg» - News of Kyrgyzstan. All rights reserved. All information posted on this website is intended for personal use only and may not be distributed without the written permission of NA «24.kg». The editorial team is not responsible for the content of reprinted materials and statements of individuals. +18