USD87.45EUR96.10RUB1.06
24.kg

New bridge to be built over Chokan Valikhanov water canal in Bishkek

10:23, 01 December 2025, Bishkek - 24.kg news agency
Baktygul OSMONALIEVA

A new bridge will be constructed over Chokan Valikhanov water canal in the capital. The press service of the City Hall reported.

According to it, a memorandum has been signed with Bai-Tash Group for the construction of a new bridge over Bishkekteploset technical canal named after Chokan Valikhanov.

The area has long been problematic: a narrow passage, low traffic capacity, and the absence of convenient sidewalks have created difficulties for residents of nearby neighborhoods and drivers. The new bridge is expected to improve transport connectivity between adjacent residential areas.

Construction will begin in 2025. The project includes six traffic lanes, a structure length of about 90 meters, and sidewalks three meters wide on each side. Completion and commissioning are scheduled for June 2026.

The project will be funded by the municipality.

CONTACTS

SOCIAL MEDIA

TelegramYouTubeWhatsAppFacebookInstagram

© News Agency «24.kg» - News of Kyrgyzstan. All rights reserved. All information posted on this website is intended for personal use only and may not be distributed without the written permission of NA «24.kg». The editorial team is not responsible for the content of reprinted materials and statements of individuals. +18