Nurlan Sadykov: Power system of Kyrgyzstan is ready for successful heating season
The power system of Kyrgyzstan is ready for the successful heating season. The Deputy Minister of the Energy and Industry Ministry of Kyrgyzstan Nurlan Sadykov said today at a press conference on preparation for the autumn-winter period 2015/2016 and the tariff policy. He assured that there would be no rolling blackouts in the winter.
\"First bad weather has caused small problems with electricity supply. Currently the lines operate in the normal mode, there could be short-term blackouts, but on the whole energy system is ready for the successful passing of the winter,\" the deputy minister said.
The official added that the volume of water in Toktogul reservoir amounted to more than 13 billion cubic meters, but the discharge exceed the inflow due to cold weather and increase in power consumption.