USD87.45EUR95.90RUB1.07
24.kg

In Kyrgyzstan 334 km of power transmission lines repaired

14:51, 15 July 2014, Bishkek - 24.kg news agency
Julia KOSTENKO

In Kyrgyzstan 513 kilometers of power lines out of 334 repaired. The Deputy General Director of JSC \"National Grid of the KR\" Aleksey Borodin sated today at a press conference.

According to him, since the beginning of 2014 20 high-voltage transmission lines with a total length 334.5 kilometers are renovated. About 100, 311.1 soms were spent on the repair campaign. \"Last year, the absolute maximum was reached in February 3000 and reached 135 MW. We had a lot of problems, power lines and Frunze substation operated with overloading,\" Aleksey Borodin said and added that soon repairs of transformers will start.

\"By winter we\'ll prepare the equipment, which can carry a maximum load,\" he said.


CONTACTS

SOCIAL MEDIA

TelegramYouTubeWhatsAppFacebookInstagram

© News Agency «24.kg» - News of Kyrgyzstan. All rights reserved. All information posted on this website is intended for personal use only and may not be distributed without the written permission of NA «24.kg». The editorial team is not responsible for the content of reprinted materials and statements of individuals. +18