USD87.45EUR95.90RUB1.07
24.kg

Power engineers repair power line from Toktogul hydroelectric station

10:21, 29 May 2019, Bishkek - 24.kg news agency
Julia KOSTENKO

Power engineers repaired a high-voltage power line of 500 kilovolts Toktogul HES — Datka on Airy-Tash Pass. National Electric Network of the Kyrgyz Republic OJSC reports.

The power line is located in an inaccessible mountain area. Considering the complexity and danger of the repairs carried out, power engineers were monitored by special services for the control and compliance with safety measures.

Recall, an emergency shutdown associated with a wire break occurred on January 1 at this site. At that time, power engineers managed to quickly restore power supply using a temporary scheme.

Electricity from Toktogul hydroelectric station is transported to the north and south of the republic with the help of this line.

CONTACTS

SOCIAL MEDIA

TelegramYouTubeWhatsAppFacebookInstagram

© News Agency «24.kg» - News of Kyrgyzstan. All rights reserved. All information posted on this website is intended for personal use only and may not be distributed without the written permission of NA «24.kg». The editorial team is not responsible for the content of reprinted materials and statements of individuals. +18