USD87.45EUR95.90RUB1.07
24.kg

Bishkek being prepared for resumption of hot water supply

10:08, 27 May 2019, Bishkek - 24.kg news agency
Julia KOSTENKO

Bishkekteploset JSC will conduct tests on the density of heat networks from May 28 to May 31. Press service of the company reported.

Routine tests are conducted annually on a mandatory basis in preparation for the next heating season.

Purpose of the tests is to detect weak sections of heat networks and eliminate them. At the same time, pipeline breaks and road pavement collapses are possible.

In case of detection of breaks and collapses of pavement, residents are asked to report to the Bishkekteploset Dispatching Service or the Consumer Support Center at 61-11-69, 56-85-58, 1980.

CONTACTS

SOCIAL MEDIA

TelegramYouTubeWhatsAppFacebookInstagram

© News Agency «24.kg» - News of Kyrgyzstan. All rights reserved. All information posted on this website is intended for personal use only and may not be distributed without the written permission of NA «24.kg». The editorial team is not responsible for the content of reprinted materials and statements of individuals. +18