USD87.45EUR95.90RUB1.07
24.kg

Anti-avalanche gallery to be built on Bishkek-Osh highway for $40 mln

09:53, 04 February 2019, Bishkek - 24.kg news agency
Tatyana KUDRYAVTSEVA

Construction of an anti-avalanche gallery of about 5.8 hectares will begin in 2019 on Bishkek-Osh highway. The Ministry of Transport and Roads of Kyrgyzstan reported.

According to the ministry, the gallery will appear in Chychkan gorge at the 246th kilometer of Bishkek-Osh road. The width of the road inside the gallery will be 9.5 meters, the roadway — 7 meters. It is planned to install the lighting inside the gallery and on its both portals.

The grant amount of 4.3 billion Japanese yen (about $ 40 million) is provided by the Japan International Cooperation Agency (JICA). JICA selected Japanese construction company CTI Engineering International as a construction contractor.

CONTACTS

SOCIAL MEDIA

TelegramYouTubeWhatsAppFacebookInstagram

© News Agency «24.kg» - News of Kyrgyzstan. All rights reserved. All information posted on this website is intended for personal use only and may not be distributed without the written permission of NA «24.kg». The editorial team is not responsible for the content of reprinted materials and statements of individuals. +18